Bridge Floodgate Closed

Concerned local residents have closed the Greentree Brae floodgate as the level of  Freuchie Burn continues to rise.

Greentree Bridge floodgate closed on 10th August 2011
Photo: Greentree Brae Bridge floodgate

The Freuchie Burn was running at about 60% when checked around 1:30pm today.